A risk register and corrective actions that don’t get forgotten
Record your transport risks and the controls you use, and track every corrective action to close. When an auditor asks how you manage risk, it’s all in one place.
A risk register in a drawer
Most operators have done a risk assessment at some point. The register goes in a folder and isn’t looked at until the next audit. Corrective actions get agreed at a meeting and quietly forgotten. Auditors see a document, but not a system that’s used.
How it works
-
1. Record your risks
List the risks from your transport work, with a rating.
-
2. Add the controls
Record the controls you use to eliminate or minimise each risk.
-
3. Track corrective actions
Actions from incidents, hazards, audits and reviews are assigned and tracked until they’re done.
What’s included
Risk register
Your transport risks in one place, with ratings.
Controls
The controls for each risk, recorded against it.
Corrective actions
Every action assigned to a person and tracked to close.
One record
Risks, controls and actions together, ready for reviews and audits.
Risk management under the SMS Standard
Risk management is one of the five elements of the SMS Standard 2026. It expects you to identify hazards, assess risks by likelihood and consequence, put controls in place so far as is reasonably practicable, manage incidents with corrective actions, and review controls when things change. A register and tracked actions cover all five.
What a risk register entry looks like

| Risk | Rating | Controls | Corrective action |
|---|---|---|---|
| Driver fatigue on night runs | High | Rosters within approved hours; EWD warnings; fit to drive declarations | Review the Tuesday night roster after two near-limit weeks. Owner: scheduler. Due: 2 weeks |
| Unsecured load | Medium | Load restraint training; pre-departure check | Toolbox talk on restraint for curtain-siders. Owner: ops manager. Due: this week |
Example only. Rate and control your own risks.
Spreadsheet vs ManageVehicle
| Item | Spreadsheet or document | ManageVehicle |
|---|---|---|
| Keeping it current | Updated before audits | Updated as things happen |
| Corrective actions | Easy to lose track of | Assigned and tracked to close |
| Linking to incidents and hazards | Separate files | In the same system |
Risk register FAQs
What is a risk register?
A list of the risks from your work, how serious they are, and the controls you use to manage them.
What is a corrective action?
A fix for a problem found through an incident, hazard report, audit or review, with a person responsible and a due date.
Can I track corrective actions until they’re done?
Yes. Every corrective action is assigned and tracked to close.
Do I need a risk register for HVA?
The SMS Standard 2026 expects you to identify, assess and control your risks and review them. A risk register is the usual way to show that.
Where do corrective actions come from?
Incidents, hazard reports, audits, internal reviews and changes to your work.
Is there a free template?
Yes. Our free fatigue risk assessment template covers fatigue risks.
Explore more
-
Hazard reporting
Explore Hazard reporting -
SMS software
Explore SMS software -
Fleet safety software
Explore Fleet safety software
See your risk register in ManageVehicle
We’ll show you risks, controls and corrective actions tracked to close.